Underground CT Cabinet Service

Download a PDF version: CT Cabinet Standard

General Information for an Underground CT Cabinet Service

  • A CT cabinet is required on all services above 320 amps and on 480V services above 200 amps (except when the pad mount is metered)
  • Meter Socet shall be mounted 5' above the finished grade
  • CT cabinet shall be mounted so that the bottom is 2' above the finished grade
  • Service is to be member-owned meaning a member is to install service wire from CT cabinet to the base of the pole leaving approximately 40' at the base for KV REMC to connect at the pole top