200 Amp Underground Service on Panel

Download a PDF version: 200 Amp Underground Service on Panel (PDF)

General Information for Underground Services

  • Minimum size underground service is 200 Amp
  • Member must supply 3" gray schedule 40 conduit if the service will be crossing a driveway.
  • A means of disconnect must be within 10' of the meter base.
  • Member wires connect to bottom lugs, KV REMC wires connect ot top lugs.
  • Only KV REMC service wires & member load wires are allowed in the meter socket.