Download a PDF version: Overhead Service on Meter Pole (PDF)
Entrance Location
No meter base or entrance should be installed before a KV REMC engineer has checked the proposed location.
Mobile homes require an electrician to install 4 wires from pole to home. Use #6 copper for the 4th wire and ground to frame.