Download a PDF version: 200 Amp 480V Panel Service Irrigation Unit (PDF)
General Information
No meter base or entrance should be installed before a Kankakee Valley REMC (KV REMC) engineer has checked the proposed location.
This application will work for 480 Volt (V) service where the total amperage demand does not exceed 200 amps. When 200 amps or more, a CT cabinet is required.
Member to bury wire from panel to pole with 40 feet at base of pole to connect to transformers.